| As the crews were cleaning Truck 58 after the 61 box, York County dispatched the Structure Fire asignment to the 100 block of Windy Hill Rd. for the attic on fire. Chief 58 and Engine 58-1 arrived on side "A" with smoke showing from Side "C&D" Engine 58-1 stretched an attack line through Side "A" as Engine 61-2's Crew advanced a back-up line Truck 58's crew threw ladders to sides "A and B" and opened up on the interior. Engine 452 (Balt. Co) took a position on side "C" and Engine 54-3 set up RIT. Engine 61-2 and 452 laid 2400' of Supply Line to establish a continuous supply as the units operated and quickly contained the fire traveling in the walls due to a lightning strike. Chief 58 (McGillin) was the Incident Command, Chief 61 (Myers) Had Interior Division, Chief 58-1 (Holloway) was Roof Division and Deputy 58 (Wilhelm) Had Safety |